Hollywood Permit Requirements

Your documents checked against 284 city-specific requirements. Missing items, gotchas, and compliance score — in seconds.

Check Your Package →
21
Types
284
Items
60
Gotchas
Building Department
Requirements by Trade
General / Structural3

Building Permit

63
  • Completed Broward County Uniform Building Permit Application — signed by Property Owner/Agent AND Contractor
  • Letter of Transmittal (Hollywood-specific cover sheet) — required for ALL ePermit submittals
  • + 61 more

Demolition Permit

13
  • Completed Broward County Uniform Permit Application from licensed General Contractor
  • SEPARATE Plumbing Permit for sewer and water cap off/removal — provide Plumbing Permit number with this application
  • Broward County Asbestos Program Statement of Responsibilities form
  • TECO Gas clearance letter
  • + 9 more

Certificate of Occupancy / Certificate of Completion

7
  • Certificate of Occupancy/Completion Request Form
  • All final inspections must be passed
  • Final signed/sealed survey and elevation certificate required for new buildings, additions, and site work
  • Energy Building Certification Prior to Final Form
  • + 3 more
Roofing1

Roofing Permit

18
  • Letter of Transmittal for ePermit submittals
  • Broward County Asbestos Program Certificate of Submittal
  • + 16 more
Electrical3

Electrical Permit

12
  • Completed Broward County Uniform Permit Application (Electrical checked) — signed by Owner/Agent and Contractor
  • Letter of Transmittal for ePermit submittals
  • Licensed Electrical Contractor required
  • Contractor's Record Management Form — signed and notarized
  • + 8 more

Solar Photovoltaic System Permit

12
  • Roof plan — scale drawing showing location of solar panel installation on roof
  • Mandatory Countywide Rooftop Mounted Equipment Affidavit (Board Policy 22-03)
  • Florida Solar Energy Center (FSEC) System Approval Report OR signed/sealed engineered drawings
  • + 9 more

Generator Permit

8
  • Completed Broward County Uniform Permit Application from licensed contractor
  • Generator specifications and cut sheets
  • Site plan showing location with setbacks
  • If visible from public right-of-way, indicate screening method
  • + 4 more
Plumbing2

Plumbing Permit

24
  • Completed Broward County Uniform Permit Application (Plumbing checked) — signed by Owner/Agent and Contractor
  • Letter of Transmittal for ePermit submittals
  • Licensed Plumbing Contractor required
  • Plumbing plans showing work location — signed/sealed for complex work
  • + 20 more

Water Heater Replacement Permit

7
  • Completed Broward County Uniform Permit Application (Plumbing checked) from licensed Plumbing Contractor
  • Owner-Builder Affidavit if applicable (not for commercial or condos)
  • If tankless water heater: SEPARATE sub-permit application from licensed Electrical Contractor
  • HOA/Condo Association letter if applicable
  • + 3 more
Mechanical / HVAC1

Mechanical/HVAC Permit

14
  • Completed Broward County Uniform Permit Application (Mechanical checked) — signed by Owner/Agent and Contractor
  • Letter of Transmittal for ePermit submittals
  • Licensed Mechanical Contractor required
  • AHRI Certificate of Product Ratings for A/C equipment being installed
  • + 10 more
Windows & Doors1

Window / Door Permit

17
  • Current Miami-Dade NOA or Florida Product Approvals — all elements identified via circle or cloud
  • Broward County Uniform Retrofit Window & Door Schedule (effective July 1, 2020)
  • + 15 more
Pool & Spa1

Swimming Pool / Spa Permit

12
  • Completed Broward County Uniform Permit Application (Structural) from licensed contractor
  • Electronic Digital Signature Affidavit
  • + 10 more
Fence & Driveway3

Fence Permit

14
  • Owner-Builder Disclosure Statement if applicable
  • Survey affidavit if survey is 1-10 years old; surveys over 10 years old NOT accepted — new survey required
  • + 12 more

Driveway Permit

9
  • Completed Broward County Uniform Permit Application (Engineering) from licensed Structural Contractor or owner-builder
  • Current signed/sealed property survey — must be less than 1 year old from application date; NO previous markups
  • Survey Affidavit if survey is 1-10 years old (for certain scope of work including driveways)
  • Site plan showing location of existing and/or proposed driveway with proper setbacks, dimensions, and material
  • + 5 more

Shed Permit

8
  • Completed Broward County Uniform Permit Application from licensed Structural Contractor or owner-builder
  • Current Miami-Dade NOA or Florida Product Approval OR construction plans signed/sealed by Design Professional
  • Survey showing location and dimensions of storage shed
  • Survey Affidavit if survey is 1-10 years old
  • + 4 more
Marine / Waterfront2

Dock/Marine Structure Permit

10
  • Completed Broward County Uniform Permit Application from licensed General Contractor or Marine Contractor
  • Completed Engineering Permit Application
  • Broward County Environmental Resource General License
  • Contract or Schedule of Values for proposed work
  • + 6 more

Seawall Permit

8
  • Completed Broward County Uniform Permit Application from licensed General Contractor
  • Special Inspector Form signed/sealed by PE/Architect if pile installation utilized
  • Contract or Schedule of Values for proposed work
  • + 5 more
Signs1

Sign Permit

13
  • Completed Broward County Uniform Permit Application from licensed General Contractor
  • Current copy of Certificate of Use
  • Color rendering of proposed sign
  • Survey showing location
  • + 9 more
Business & Admin3

Change of Contractor

6
  • Hold Harmless/Indemnity Letter — per Broward County Administrative Provisions FBC 105.6.4 & 105.6.4.1
  • NEW Broward County Uniform Building Permit Application — must be submitted with Hold Harmless request
  • Amended Notice of Commencement may be required from property owner
  • All supporting documents must be signed and notarized by requesting entity
  • + 2 more

Private Provider Permit

5
  • Private Provider — Permit by Affidavit form
  • Plan Review Services: Administrative fee = 72% of standard processing fees (28% reduction)
  • Building Inspection Services: Administrative fee = 84% of standard building permit fees (16% reduction)
  • All standard permit documents still required
  • + 1 more

Right-of-Way Utility Permit

4
  • Any work done in right-of-way requires SEPARATE Engineering permit application
  • Engineering permit fee: 5% of value of work (minimum $57)
  • Maintenance of Traffic Plan required
  • NOTE: Separate ROW Utility Checklist available on forms page

Common Rejection Reasons

8 documented for Hollywood. Our AI flags all of these.

1CLOSED ON FRIDAYS — Building Division hours are Mon-Thu 7am-6pm ONLY
2Insurance certificate must list EXACT wording: 'City of Hollywood, Department of Development Services, 2600 Hollywood Blvd., Hollywood, FL 33020' — AND City must be named as Additional Insured
3NOC thresholds DIFFER BY PERMIT TYPE: $2,500 general building/additions; $5,000 for roofing, pool, fence, driveway, electrical, plumbing, solar, seawall, demo, shed, sign, water heater; $15,000 for A/C changeout
4Alliance page says A/C NOC threshold is $7,500 but the ACTUAL AC checklist (updated 8/20/24) says $15,000 — trust the checklist
530-day plan review period does NOT include Planning, Zoning, Engineering, or Fire review time — actual total can be much longer
6Permit applications become NULL AND VOID after 60 calendar days if no action taken after last review notification
7Owner-Builder cannot sell house/duplex for 1 YEAR after final inspection
8Chain link fencing NOT permitted in RAC district or Historic District; NOT permitted in front yard in TOC district
What You Get

Sample analysis for a Hollywood roofing permit:

Analysis Complete
Hollywood · Roofing
73%
Compliance
×Roof Material WorksheetMissing
×Product Approval (NOA)Missing
Signed & Sealed PlansFound
Permit ApplicationFound
Notice of CommencementFound
Product approvals must show FL# or Miami-Dade NOA — generic spec sheets will be rejected.
Try With Your Docs →
Free
$0
1/month
Pro
$29/mo
30/month
Single
$15.99
One-time
FAQ
What documents do I need for a permit in Hollywood?

Typical requirements: completed application, signed & sealed plans, site survey, product approvals (FL Product Approvals), energy calcs for HVAC, and NOC if job exceeds the threshold. Our AI checks against all 284 Hollywood-specific items.

How do I submit a permit in Hollywood?

Contact Hollywood Building Department.

What causes rejections in Hollywood?

Top reasons from our 60 documented gotchas: CLOSED ON FRIDAYS — Building Division hours are Mon-Thu 7am-6pm ONLY... Our AI flags all 60 automatically.